Industry News Company News
1.When the new evaporation boat is used, the voltage is gradually increased by screen operation to control the time, each time the voltage is increased for 5 minutes, and them it is increased again( for example 7V-8V-9V)or started according to the program set by the aluminum plating machine. Gradually boost and heat the evaporation boat process anneal to release internal pressure. At the same time, the gas absorbed inside the boat material is also released. Aluminum wire combines with the evaporation boat, and it takes about 20 minutes to wet it. Wetting too fast will reduce the stability of the evaporation gas and greatly shorten the service life of the evaporation boat.
see details
Contact us
Support
Cooperation
Join us